RåBuild is the new alternative to timber frame building.
A modern method of construction, RåBuild uses the Thin-joint
System, offering the speed of a timber frame build with the
stability of a traditional stone build.
The Thin-Joint System combines the range of high quality,
accurately-dimensioned aircrete blocks with Celfix, a specially
developed Thin-Joint mortar. Thin-Joint blockwork enables
walls to be built very quickly without having to wait the
conventional 24 hours for the mortar to set before further
loading can be applied
Thin joint Mortar is cement based and supplied as a dry, pre-mixed
powder in 25kg bags. It has been designed to replace the traditional
sand:cement mortar. Thin joint Mortar starts to set within
10 minutes of application and approaches full design strength
in just 1 to 2 hours. This enables blockwork to be built extremely
quickly, and in the case of cavity wall construction independently
of the outer leaf, which is normally brickwork.
Thin joint Mortar is easily mixed on site by just adding the
appropriate quantities of water. It is applied with a proprietary
scoop or sledge, which will create a consistent joint thickness
of 2mm.
- A weather tight masonry structure is achieved quickly
and efficiently with a single team of experts.
- Shorter lead times are required when ordering materials
as blocks are available ex-stock.
- Unlike a timber frame build, which has to settle before
the roof goes on, using RåBuild, the roof can go straight,
vastly speeding up the duration of the build.
- The aircrete blocks used in RåBuild construction
are much more lightweight with a higher thermal value compared
totraditional dense block. This allows you to cut down on
insulation.
- RåBuild construction can be used from slab level
all the way up to securing on the roof. This reduces the
number of sub-contractors required on site and eases coordination
between suppliers.
- Our RåBuild constructors are experts in their field,
trained to install floors, walls and roofs at a high standard.
- Our RåBuild constructors can install intermediate
floors and secure roofs, using Sirs panels or roof trusses.
- RåBuild can offer a full service of supply and
fix.
- With a RåBuild project, the outer leaf can be added
as and when as the property will already be watertight.
- RåBuild projects generate less wastage and large
cement mixers are not required; water electricity, a scoop
& bucket and a paddle mixer are all you need.
^
Return to top
Base course is absolutely critical – must get completely
flat and built on traditional mortar mix.
^ Return to top
Contact us to discuss how RåBuild could be the building
option for you:
0131 663 0048
enquiries@RåBuild.com
0131 663 7456
Opal Building Group
Unit 5
Mayfield Industrial Estate
Dalkieth
Midlothian
EH22 4AD
www.opalbuildinggroup.co.uk
^ Return to top
|